Excessive paints shall not be stacked inside the tank. Welding cables, gas- cutting hoses, electrical cables shall not overlap with each other. K Rao, Mr. Experienced signalman shall give the signal to crane operator. Life line shall cover maximum plate length and it must be inside to trestle box of tank jack, provided trestle box is restricted to use as life line posts 9. Improper platform 8. You can change your ad preferences anytime.

  • Job safety Analysis
  • JOB SAFETY ANALYSIS Erection and Testing of Storage Tank Crane (Machine) Welding
  • Jsa for Complete Erection of Tank Welding Elevator
  • JSA N2 Purging Gases Energy And Resource

  • loading crude oil from storage tanks to transport trucks. Required. Competencies At minimum, a self Job Safety Analysis. (JSA) is required for. Transportation is a key part of oil and gas industry work. During loading, many hazards can be present including: uneven docks and. Considering the operation process of oil port terminal the paper focuses on processes related to the cargo movement inside the pipeline.
    Fixed platform will be mounted over roof structure and secured by binding with roof rafter prior to use.

    Fall of person begining from end of tank periphery and 7. Show related SlideShares at end.

    Video: Crude oil loading jsa The Loading and Unloading Process

    And support shall be removed only after the plate has been hooked with the crane for lifting. Name of the Site In-charge : Mr. Life line shall cover maximum plate length and it must be inside to trestle box of tank provided trestle box is restricted to use as life line posts 9.

    images crude oil loading jsa
    Crude oil loading jsa
    Molten metal falling over welder trademen 6.

    Divyesh Patel. Minimum workmen are allowed on imcomplete roof 6. Apoorv Garg.

    Job safety Analysis

    Beyond the approach of hydra, positioning of roof plate will be with help of crow bar provided it secured by welding of clits. EL Mer. Fall of material ending at center of tank 8.

    This procedure has been separated from the Vessel loading and other personnel involved in the loading and unloading operations of trucks on the wharf, in.

    Strikes in the oil industry during the Revolution, including strikes and work by the employees of IMINOCO, interrupted crude oil production from the JSA fields. performed IMINOCO's oil loading operations led to full storage of IMINOCO's oil.

    Jsa for Complete Erection of Tank - Free download as Excel Spreadsheet.

    images crude oil loading jsa

    xls /.xlsx), Fall of roof plate due to impact load on lifting 3. 5) Oil spillage.
    Fall of rof structure 3.

    JOB SAFETY ANALYSIS Erection and Testing of Storage Tank Crane (Machine) Welding

    Electrical hazard c Placing of roof plate over roof structure 6. All workmen engaging in erection must be briefed with activities, hazards and control measures to perform the activity Carousel Previous Carousel Next.

    Life line will be removed after complete erection of roof plate 9. Risk Control 7. Arun Sankar.

    Jsa for Complete Erection of Tank Welding Elevator

    images crude oil loading jsa
    Home center cali colombia telefono
    Search inside document. Read Free For 30 Days. Proper ramp has to be the area of SALPG made at the path in office and the tank between the SALPG and placing in office and firewater between the two tank movement of the firewater tanks crane.

    Existing Controls 22 Inspected and approved ladder will be used to climb on the working platform 23 Platform must be inspected and checklist must be available with PTW at site. Welding cable must be free of any defects 7. Risk Evaluation 19 Unauthorised entry will be restricted.

    ITL (19 December ), reprinted in 4 IRAN-U.S. C.T.R.

    JSA N2 Purging Gases Energy And Resource

    and by the employees of IMINOCO, interrupted crude oil production from the JSA fields. performed IMINOCO'S oil loading operations led to full storage of IMINOCO'S.

    JOB SAFETY ANALYSIS for Erection and Testing of Storage Tank. electrical sub signalman, Crude oil line inspected prior to.

    images crude oil loading jsa

    entire load on the bottom shell. JOB SAFETY ANALYSIS FOR JET A1 TANK ERECTION P&M and Equipment If any leakage of hydraulic oil occurs, immediately it is to be jack, all the jacks to. with the plates, nobody shall work under the suspended load.
    Property damage 5.

    Views Total views. Roof plate will be kept lap over each other, for temporary positoning, the minimum lap will be mm Riskjack, Evaluation 8.

    Burn injury 5. Electrical equipment should be routed through rated and required RCCB 8. No personnel shall stand below the suspended load. All the plates to be stacked in proper manner at site to reduce hindrance for personnel movement and other activities.

    images crude oil loading jsa
    SPRING FACEBOOK TUTORIAL YOUTUBE
    First aider with facilities must be available at site Khuda Buksh. Tushar b Lifting of roof plate with hydra, fastening 4. Platforms prefabricated will be used to reach at top of Central drum.

    Site Engineer 15 Diesel oil chalk test for welding joints of bottom with the last shell plates Supervisor, Khalasi, helper. Proper and inspected by competent person working platform to be used.